LosEnergy

Data and method

Everything behind the numbers on the home page: every registered estimate, the daily receipts, how the estimates are made, what a delivery contains and where the data comes from.

The record

Every registration, in the order it was made. An estimate stays sealed until the company reports.

As of 14 November 2026

How a call is made and scored

After a reporting period closes, we register an estimate of what the company has not yet reported. For PNE’s nine months, that was the third quarter, added to the first half it had already published.

An estimate is registered again only if it moves by more than 0.5%. The last version registered before the day of the report is the one scored. A registration on the report day itself does not count, since reports come out before the market opens.

Every registration

Registered, UTC Company Period Our estimate Company’s figure Error
2026-11-0400:00:18 PNE AG 9M 2026 187.1 GWh9M: 595.1 GWh 181 GWh9M: about 589 GWh +3.4%9M: +1.0%
2026-11-0400:00:18 7C Solarparken 9M 2026 Sealed Not yet reported –
2026-11-0415:53:39 7C Solarparken 9M 2026 Revised, sealed Not yet reported –
2026-11-0517:16:42 Solaria 9M 2026 Sealed Not yet reported –
2026-11-0913:21:54 Solaria 9M 2026 Revised, sealed Not yet reported –

The first line of each figure is the part scored: for PNE, the third quarter. 9M is the nine months to September. A sealed estimate’s value is added here on the day the company reports.

PNE AG, third quarter, against two baselines

PNE’s nine-month statement on 12 November put output at about 589 GWh. Less the 408 GWh it reported for the first half, the third quarter came to 181 GWh.

Error against PNE’s third-quarter figure
Seasonal normal:
the fleet’s capacity at a normal yield for those months.
Same quarter last year:
last year’s output for the same months, scaled to the current fleet.

Seal-by dates, full-year 2026

We seal each full-year estimate by the dates below. Only PNE has announced its date; for the others we set the deadline early, from their past release dates.

January 2027

  • EDP Renováveis
  • Greencoat UK Wind

February 2027

  • TRIG
  • RWE
  • Ørsted
  • Solaria

March 2027

  • PNE date announced
  • Energiekontor

April 2027

  • clearvise

Receipts

Each morning’s vintage is fingerprinted and committed to version control the same morning.

A receipt records when the vintage was written, the code version that wrote it, which companies were published or withheld, and two SHA-256 fingerprints: one of the vintage’s manifest, and one over the list of every file in it with each file’s own fingerprint. Change one number in one file and the second fingerprint no longer matches.

First live receipt, 13 November 2026
Committed
2026-11-13 06:46:58 UTC
Code version
d7e03142ab40
Companies
10 published, none withheld
Files
3
Manifest SHA-256
1569ddf078d8a6729022131c9ec666333edb5f7891b801a25507725388fee130
Data SHA-256
8097359b7fc8bbeff7591a38fddcc26bceca60ba537aefe0818a26143960e5ed

To check a vintage we have sent you, its manifest must give the same fingerprint as the receipt:

sha256sum _manifest.json

Receipts are kept in our version-controlled ledger, one per morning, and are open for audit on request.

Method

Three steps, every morning.

  1. Map each fleet

    From each company’s own reports we record which assets it owns, their capacity, the bidding zone each one sits in and the company’s share. Maps are versioned: an estimate always uses the map as it stood on that day. A company whose map has drifted more than 5% from the capacity it declares is withheld, with the reason recorded, rather than published with a known bias.

  2. Read the grid

    Every morning we take actual generation and installed capacity by zone and production type from the ENTSO-E Transparency Platform. In Great Britain we read the meters of 34 wind farms, 65 units in all, from Elexon’s settlement data, for the four companies with large British fleets. A farm in more than one portfolio, such as London Array, is read once and shared by stake.

  3. Calibrate and seal

    Each estimate is scaled by how the model compared with the company’s own past reports, then written into the morning’s vintage, fingerprinted and committed.

Where meters exist: Ørsted’s UK offshore wind, Q1 2023 to September 2026

A backtest, run after the reports were out: it shows what the method can do, not a sealed record. Read from each farm’s own meters, our estimate came within −0.1% to +1.2% of what Ørsted reported, in every period. Built from zone data alone, it ran 11% to 26% low.

Range of errors across all periods

Coverage

Bidding zones in which each company has capacity in our ownership map.

Bidding zones in which each company has capacity in our ownership map
CompanyMWBEDE-LUDK1ESFIFRGBGRHUIEITNLPLPTROSETR
RWEETR:RWE47,368*Germany and LuxembourgSpainFranceGreat Britain, meteredItalyNetherlandsPolandSwedenTürkiye
EDP RenováveisELI:EDPR18,795BelgiumGermany and LuxembourgSpainFranceGreat BritainGreeceHungaryItalyNetherlandsPolandPortugalRomania
ØrstedCPH:ORSTED13,507Germany and LuxembourgDenmark, westFranceGreat Britain, meteredIreland and Northern IrelandNetherlands
SolariaBME:SLR3,033SpainGreeceItalyPortugal
TRIGLON:TRIG2,269Germany and LuxembourgSpainFranceGreat Britain, meteredSweden
Greencoat UK WindLON:UKW1,942Great Britain, metered
7C SolarparkenETR:HRPK504BelgiumGermany and Luxembourg
PNEETR:PNE3478Germany and Luxembourg
EnergiekontorETR:EKT460.6Germany and LuxembourgGreat BritainPortugal
clearviseETR:ABO388Germany and LuxembourgFinlandFranceIreland and Northern Ireland
  • RWEETR:RWE47,368*MW
    DE-LUESFRGBmeteredITNLPLSETR
  • EDP RenováveisELI:EDPR18,795MW
    BEDE-LUESFRGBGRHUITNLPLPTRO
  • ØrstedCPH:ORSTED13,507MW
    DE-LUDK1FRGBmeteredIENL
  • SolariaBME:SLR3,033MW
    ESGRITPT
  • TRIGLON:TRIG2,269MW
    DE-LUESFRGBmeteredSE
  • Greencoat UK WindLON:UKW1,942MW
    GBmetered
  • 7C SolarparkenETR:HRPK504MW
    BEDE-LU
  • PNEETR:PNE3478MW
    DE-LU
  • EnergiekontorETR:EKT460.6MW
    DE-LUGBPT
  • clearviseETR:ABO388MW
    DE-LUFIFRIE
Capacity in the zone Read from the farms’ own meters

MW is the capacity each company declares, as recorded in our ownership map. *RWE declares 47,368 MW; 33,551 MW of it is mapped to the zones shown.

Delivery

Two clocks on every row: the day the electricity was produced, and the moment we could know it.

Rows are only ever added. A revision is a new row with a later timestamp, so any past morning can be rebuilt exactly as it stood. That answers the question every due diligence asks: could you have known this on that date?

event_date
The day the electricity was produced
as_of_ts
The moment we could know it, in UTC
revision_n
0 for the first estimate of that day, then 1, 2 and so on
ticker, isin
The company
zone
The bidding zone
technology
The production type, as grid operators name it
generation_mwh
Estimated generation, in megawatt-hours
coverage_pct
The share of the day’s intervals with grid data
path
Metered, attributed from zone data, or mixed
map_version
The ownership map the estimate used
method_version
The method, so a change of method is never mistaken for a revision of data
source_fingerprints
Fingerprints of the input data
confidence
Verified, estimated or unverified

History

Live, point-in-time vintages since 13 November 2026. History before that is rebuilt with the same code, from 2021 for five companies and from 2023 for the other five. Rebuilt history runs on today’s data, which grid operators may have revised since, so it is a backtest, not a record of what was knowable at the time.

Files

One vintage per morning, as Parquet files, with a manifest that lists the sources the vintage rests on, their licence terms and the reason for any company withheld. The column order is fixed, and a change of method raises the method version.

Sources

Public data only. No personal data, and nothing from inside the companies.

  • ENTSO-E Transparency PlatformActual generation and installed capacity by bidding zone and production typeSource: ENTSO-E Transparency Platform.
  • Elexon BMRSMetered output of British wind farms, from settlement dataContains BSC information licensed under the BSC Open Data Licence.
  • National Energy System OperatorBritish embedded wind and solar generationSupported by National Energy SO Open Data
  • Department for Energy Security and Net ZeroBritish installed capacityContains public sector information licensed under the Open Government Licence v3.0.
  • National capacity statisticsInstalled capacity for Spain, Portugal, Ireland, Sweden and Belgium, from grid operators and industry bodies, including Red Eléctrica and REN
  • Company reportsFleets, stakes and reported production, from annual and interim reports

The licence terms of every source are recorded with each vintage and are available on request.